Case studies, with the model and its data

Each case starts from a concrete question about the energy system, answers it with a model you can run again, and comes with a page where you watch the answer change as you move a slider. For each case: the interactive page, the executed notebook, the figures, the data and the code. These are textbook cases, not forecasts.

They are built with POMMES, the open-source energy-system planning tool of the PERSEE centre (MINES Paris – PSL), and accompany the training course “Evolution of the power system in the context of the energy transition” (MINES Paris – PSL Executive Education, in French).

Electricity and hydrogen prices in Europe in 2030, 2035 and 2040: the POMMES model on the TYNDP 2026 scenarios
13 October 2026

Electricity and hydrogen prices in Europe in 2030, 2035 and 2040: the POMMES model on the TYNDP 2026 scenarios

Our European model (POMMES, 16 zones, 8,760 hours) on the National Trends+ scenario of TYNDP 2026: in 2030 it matches the ENTSO-E prices (55.7 against 57.2 €/MWh in France); in 2040 it is 18 €/MWh lower; the seasonal management of water and hydrogen storage explains most of the gap on expensive hours, not on the average price. Duration curves, 30 weather years, diagnostics and downloadable series.

Interactive page, notebook, data and code
Fos-sur-Mer: what is hydrogen storage worth, and what does doing without gas cost?
5 October 2026

Fos-sur-Mer: what is hydrogen storage worth, and what does doing without gas cost?

If Fos-sur-Mer made its 83.5 kt of hydrogen a year entirely by electrolysis, the Manosque salt cavern would be worth €0.48/kg at €1,350/kW and €1.34/kg at €417/kW. Without a mandate it is worth nothing: the gas reformer already provides flexibility. A page to play with CAPEX, gas and the weather year.

Interactive page, notebook, data and code

The code and data of every case are in the public repository pommes-case-studies.